Water Pump Testing Procedure
A pumping test is a field experiment in which a well is pumped at a controlled rate and water level response is measured in one or more surrounding observation wells and optionally in the pumped well control well itself.
Water pump testing procedure. Open the suction valve allow water to flow into the pump. Source and destination of water. 5 the basic principle of a pumping test is that if we pump water from a well and measure the pumping rate and the drawdown in the well then we can substitute these measurements into an appropriate formula and can calculate the hydraulic characteristics of the aquifer. Determine appropriate location for pitot tube.
Ensure that pipe alignment is done. Start the pump and record shut off head. The setting of test data is done semi automatically and requires appropriate test experience and accuracy. Hydro testing a new water line essentially begins during the design phase.
How when and why to test water what to test for in drinking water supply water potability testing guide water bacteria test guide how to conduct water tests what water tests to order how to avoid dishonest or cheating on water tests wells water tanks piping supply. Determine pumps to be tested. Normal operation of the pumps. Every year thousands of water pumps are replaced because the engine is overheating but haven t been tested.
You can test many water pumps in a few minutes w. 4 2 place and time of testing. Ensure the discharge valve is closed. Response data from pumping tests are used to estimate the hydraulic properties of aquifers evaluate well performance and identify aquifer boundaries.
The basic principle of a pumping test is that if we pump water from a well and measure the pumping rate and the drawdown in the well then substitute these measurements into an appropriate formula. Pump testing procedures on arrival. Commissioning procedure for water booster pumps. It is also called as aquifer tests for aquifer parameter evaluation.
For the handling of the test beds only trained personnel is employed. Can pumps operate long enough to complete tests. In this video i quickly go through how to testing the water pump in an outboard motor. Understanding testing factors during design will enable the water professional.
The main tips are having the outboard deep enough in the water and mak. The testing is done on the test bay of the manufacturer. Ensure that all the precommissioning checks are carried out successfully. Only pure cold water with a density of ρ 1 kg dm3 is used as the test medium.
Determine test points i e. How to inspect test repair questions answers about when how and why to test well water for. Centrifugal pump performance test procedure. Hydrostatic test pump is designed to generate calibration pressures of up to 10 000 psi.